View Single Post
Old 04-25-2009, 06:22 PM   #5
rumbleweed
Guest
 
Posts: n/a
Default

As far as set up and take down, after 2 or 3 times, it will be about 15-20 max more than a TT, You still have to level ans set jacks. Lifting the ends and pulling out the beds and setting up bathroom walls is 10-15 mins after the first few times.
  Reply With Quote